Skip to content

Home - SSEN
  • My profile
  • Register
    • Help and advice
    • Power Track - Live updates
    • What to do during a power cut
    • Preparing for a power cut
    • Planned power cuts
    • Priority services
    • Energy advice
    • Keeping safe
    • Emergency planning
    • Service categories
    • New electricity connections
    • Moving your meter
    • Existing electricity connections
    • Generation Connections
    • Non-emergency work
    • Tools and maps
    • Service information
    • Land rights
    • Competition in connections
    • Data Portal
    • General information
    • Contact us
    • Customer support
    • Our communities
    • Who is my distributor?
    • Projects and live works
    • Careers
    • Stakeholder Engagement
    • Document library
    • Sustainability
    • Distribution System Operations
    • Our Strategy
  • News & views
  • My profile
  • Register

EV, HP and BESS Specific

This section contains information relating to EV, HP and BESS Specific

Breadcrumb
  1. Scottish and Southern Electricity Networks
  2. Our services
  3. Tools and maps
  4. G81 Library
  5. EV, HP and BESS Specific

Useful links 

G81 Library 

Tools and maps

We've recently updated our G81 Library. If you've accessed it before, you may need to review and accept our terms and conditions again before regaining access. Once you do, you'll get immediate access. If you have any trouble, feel free to reach out to us at ssenwebsite@sse.com—we're happy to help!

EV, HP and BESS Specific

  • PR-NET-NPL-001 - Planning Standards for Low Voltage Distribution Network

    PR-NET-CAB-006 - Electric Vehicle Charging Points, Supply Arrangements - Design Standard

    PR-NET-CAB-010 - Assessments of Load in Domestic Properties to Enable the Installation of Electric Vehicle Chargers

    TG-NET-ENG-004 - SSEN Matrix of Documents for use in Designing and Installing New Assets

    TG-NET-CAB-016 - Enabling battery energy storage systems to be connected to the SSEN network at all voltages - Design Standard

  • PR-NET-CAB-004 - Notification of Electrical Measurements Required to Enable G99 Fast Track Installations

    FO-NET-CAB-008 -Notification of Electrical Measurements Required to Enable G99 Fast Track Installations

  • FO-NET-ENG-063

    TG-NET-ENG-015, Asset Data Collections Forms–Completion of Forms

    TG-NET-ENG-045 - Design Review Process for ICP and IDNO Design Submissions

  • TG-NET-CAB-411 - Joints and Accessories Catalogue up to and including 33kV

Social Media

  • Facebook (opens in new window)
  • Instagram (opens in new window)
  • Twitter (opens in new window)
  • LinkedIn (opens in new window)
  • Youtube (opens in new window)
  • WhatsApp (opens in new window)
  • Bluesky (opens in new window)

Quick Links

  • Contact us
  • Careers
  • sse.com
  • Website feedback
  • Digital Accessibility

Policies and Notices

  • Privacy Notice
  • Cookie Notice
  • Refund Policy
  • Modern slavery statement

Emergency Contact

Power cut? Call 1-0-5

Company Information

Copyright © 2025 Scottish and Southern Electricity Networks
All rights reserved.

Scottish and Southern Electricity Networks is a trading name of: Scottish and Southern Energy Power Distribution Limited Registered in Scotland No. SC213459; Scottish Hydro Electric Transmission plc Registered in Scotland No. SC213461; Scottish Hydro Electric Power Distribution plc Registered in Scotland No. SC213460; (all having their Registered Offices at Inveralmond House 200 Dunkeld Road Perth PH1 3AQ); and Southern Electric Power Distribution plc Registered in England; Wales No. 04094290 having their Registered Office at No. 1 Forbury Place 43 Forbury Road Reading RG1 3JH which are members of the SSE Group

Chat on Facebook Messenger